Hydropower Station
Ecuador TP (TOACHI-PILATON) Station

Ecuador TP (TOACHI-PILATON) station is located southwest of the city of Quito, Ecuador, about 80 km Pilaton River, the Toachi River, consists of two hydropower stations: the installed capacity of 49MW respectively and 204MW, a total of 253MW. The main buildings include Pilaton dam and water intake, headrace tunnel and power house, Toachi dam, diversion tunnel and power house and so on. Which, Pilaton dam and water intake works include: 3-hole sluice, spillway, stilling basin, grit chamber, intake. Two hydropower by the diversion tunnel, surge shaft, penstock, powerhouse, surge chamber, drain hole and switch stations.